How CertainTeed One Precision Assemblies Accelerates Construction with Factory-Built Precision

Faster Homes, Longer Performance

Sponsored Content
Published

Sponsored Content

With the demand for housing in today’s fast-paced construction environment, time is money — and quality is everything.

That’s why more developers, general contractors and home builders are turning to offsite construction solutions. Combining the speed of factory-built components with the strength and durability of cutting-edge building science, modular and panelized home manufacturers are redefining what it means to build smarter and faster.

CertainTeed One Precision Assemblies
CertainTeed One Precision Assemblies is a full-service solution with comprehensive support from our team of building science experts.

Offsite construction obviously isn’t new. But the modular and panelized homes of today are advanced, high-performance structures with design customization options and long-lasting durability that far outperforms their predecessors from decades ago.

Beyond improvements in building materials and manufacturing technology, prefabricated panel companies like CertainTeed One Precision Assemblies™ (OPA™) are constantly looking for ways to improve their products and processes to build more efficiently and sustainably and with higher quality.

In an industry where timelines are tight and quality expectations are high, OPA manufactures, delivers and constructs high-performance, weather-tight building envelopes for homes built in a fraction of the time when compared to traditional building methods.

Say Goodbye to Weather Delays

Traditional stick-built construction is often at the mercy of weather delays, labor shortages and on-site inefficiencies. OPA sidesteps these challenges by manufacturing fully insulated, code-compliant wall, floor and roof panels in a controlled factory environment. This means that while site preparation occurs, OPA panels are being built in parallel — dramatically accelerating project timelines. Once delivered, building envelopes can be assembled and made weather-tight in just days, allowing construction to proceed almost any time of year.

Offsite vs. traditional construction timeline
From design to install, CertainTeed One Precision Assemblies helps you reduce cycle time, optimize labor, minimize defects, and more.

Precision Engineering in a Controlled Environment

Crafted with meticulous attention to detail, each OPA panel ensures a perfect fit and finish. The factory setting allows for stringent quality control measures, resulting in assemblies that meet or exceed typical building codes and performance standards. This level of precision minimizes on-site adjustments and ensures that every component integrates seamlessly, reducing the risk of errors and rework.

Durable, Weather-Tight Structures Built to Last

OPA panels are designed for long-term resilience. The airtight construction and integrated moisture management systems protect against the elements, ensuring that buildings remain energy efficient and structurally sound for decades, even in harsh climates. This durability not only enhances occupant comfort but also reduces maintenance costs over the building’s lifespan.

Sustainable and Efficient Building Practices

Offsite construction contributes to sustainability goals by reducing material waste and energy consumption. The controlled manufacturing process of OPA allows for precise material usage, minimizing excess. Additionally, the streamlined logistics of transporting panels can reduce material delivery trips to the jobsite, lessening the environmental impact of emissions.

A Smarter Way to Build

CertainTeed OPA exists where speed and precision building converge. By embracing offsite construction, builders can deliver high-quality, resilient structures more efficiently than ever before.

Learn more about how CertainTeed OPA can help you build faster at certainteed.com/opa

Subscribe to NAHBNow

Log in or create account to subscribe to notifications of new posts.

Log in to subscribe

Latest from NAHBNow

Advocacy | Material Costs
Nov 25, 2026
Trump Administration Proposes New Tariffs on Several Nations

The Trump administration has proposed new tariffs under Section 301 of the Trade Act of 1974, a move that could push building material costs higher. The tariffs would apply to China, Japan, the European Union and 11 other nations.

Economics
Nov 25, 2026
New Home Sales Rise in October Amid Affordability Pressures

New home sales unexpectedly rose to a yearly high in October, even as buyers face high mortgage rates, affordability challenges and economic uncertainty.

View all

Latest Economic News

Economics
Nov 25, 2026
New Home Sales Increase in October, but Remain Below Last Year’s Pace

Despite the monthly gain, new home sales continued to trail 2025 levels, with year-to-date sales through October down 3.0% compared to the same period last year. Persistent housing affordability challenges, including elevated home prices and mortgage rates, continue to weigh on prospective buyers and constrain demand.

Economics
Nov 25, 2026
Fed’s Preferred Inflation Gauge Accelerated to Three-Year High

The Federal Reserve’s preferred inflation gauge accelerated to a three-year high in October, further adding pressure on the Fed to maintain its tightening stance. While consumer spending continued to grow, real (inflation-adjusted) spending was nearly unchanged, suggesting persistent inflation is eroding household purchasing power.

Economics
Nov 24, 2026
Declining Conditions for Multifamily Missing Middle

Multifamily missing middle construction declined during the third quarter of 2026, and the market is down on a one-year basis.