2009-2010 Residential Construction Management Competition
The NAHB Student Chapters Residential Construction Management Competition is one of the highlights at the annual NAHB International Builders’ Show. The competition gives students the opportunity to apply the skills learned in the classroom to a real construction project by completing a management proposal. The proposals are submitted to a group of construction company executives who act as judges. During the convention, students present and defend their proposals to the judges in front of an audience. The presentations will take place in Las Vegas, Nevada at the International Builders' Show.
Eligibility
Any NAHB Student Chapter in good standing from institutions that grant undergraduate degrees, diplomas, or certificates directly related to the home building industry may compete.
Getting Started
Entry Form: The deadline to enter the RCMC has passed. No additional teams are being accepted at this time.
Team Member List: The deadline has passed. No changes or substitutions are allowed.
Use the Discussions tab to ask questions to the RCMC committee.
Alpha listing of all teams. 9 secondary; 19 two-year; 43 four-year. City and state listed for secondary and two-year. State listed for four-year.
This schedule is preliminary subject to change.
Click here for e-mail updates from HBI in one consolidated document.
Secondary School Programs
Rules and Guidelines
FAQs
Grading Summary Report (also found in Rules and Regulations)
Honor Pledge Form (also found in Rules and Regulations)
Problem Description
Conference Call Notes:
September 15, 2009
October 1, 2009
November 2, 2009
Supporting Files:
Specifications (pdf)
NOTE: Teams may NOT contact builder or customer listed on project plans. Points will be deducted if contact is made.
PDF Files
Foundation Plan
Elevation1 Plan
Elevation2 Plan
Basement Floor Plan
Floor1 Floor Plan
Roof Framing Plan
DWF Files (download Autodesk FREE)
Foundation Plan
Elevation1 Plan
Elevation2 Plan
Basement Floor Plan
Floor1 Floor Plan
Roof Framing Plan
Two-Year College Programs
Rules and Guidelines
FAQs
Grading Summary Report (also found in Rules and Regulations)
Honor Pledge Form (also found in Rules and Regulations)
Problem Description
Change Order
Conference Call Notes:
September 15, 2009
October 1, 2009
November 2, 2009
Supporting Files:
Specifications (pdf)
NOTE: Teams may NOT contact builder or customer listed on project plans. Points will be deducted if contact is made.
PDF Files
Foundation Plan
Elevation1 Plan
Elevation2 Plan
Basement Floor Plan
Floor1 Floor Plan
Roof Framing Plan
DWF Files (download Autodesk FREE)
Foundation Plan
Elevation1 Plan
Elevation2 Plan
Basement Floor Plan
Floor1 Floor Plan
Roof Framing Plan
Four-Year College and University Programs
Rules and Guidelines
FAQs
Honor Pledge Form (also found in Rules and Regulations)
Problem Description
PDF Files
Magnolia Plan 1: Elevation
Magnolia Plan 1: Floor Plan
Magnolia Plan 2: Elevation
Magnolia Plan 2: Floor Plan
Magnolia Plan 3: Elevation
Magnolia Plan 3: Floor Plan
Magnolia Plan 4: Elevation
Magnolia Plan 4: Floor 1 Floor Plan
Magnolia Plan 4: Floor 2 Floor Plan
Magnolia Plan 5: Elevation
Magnolia Plan 5: Floor 1 Floor Plan
Magnolia Plan 5: Floor 2 Floor Plan
Magnolia Plan 6: Elevation
Magnolia Plan 6: Floor 1 Floor Plan
Magnolia Plan 6: Floor 2 Floor Plan
ESA for Magnolia Village
Pre Plats and Pipeline Exhibits
Geotechnical Studies
Grading and Paving for Magnolia Village
2008-2009 Problems and Solutions
Each team that enters the 2009-2010 Residential Construction Management Competition will receive last year's winning solutions as part of their entry fee.
Who Won Last Year?
2009 International Builders’ Show NAHB Student Chapters Awards Ceremony Results
Questions?
For more information regarding the NAHB Residential Construction Competition please contact: Page Browning (
pbrowning@hbi.org /202-266-8918)
Last Year's RCMC Problem - for your reference
Who Won Last Year?
2009 International Builders’ Show NAHB Student Chapters Awards Ceremony Results
Four-Year Program (LAST YEAR, 2008-2009)
The 2008-2009 four-year project was a townhome community in unincorporated area of Bexar County, which is near San Antonio, TX. The name of the subdivision is The Villas of Silverado Hills.
Two-Year Program (LAST YEAR, 2008-2009)
Problem Description (pdf)
Post Tension Foundation Plan (pdf)
Specifications (pdf)
Plot Plan (pdf)
Wind Bracing Details (pdf)
Plans and Schematics (dwf) -- (download Autodesk FREE)
Change Order
Sketch 1 (pdf)
Wind Bracing Detail (pdf)
Wind Bracing Plan (pdf)
Secondary School Program (LAST YEAR, 2008-2009)
Problem Description (pdf)
Post Tension Foundation Plan (pdf)
Specifications (pdf)
Plot Plan (pdf)
Wind Bracing Details (pdf)
Plans and Schematics (dwf) -- (download Autodesk FREE)
Sketch 1 (pdf)
Wind Bracing Detail (pdf)
Wind Bracing Plan (pdf)